125 mm water main repair at Royal Holloway

Repairing a leaking incoming main and adding a permanent isolation point to improve control of the university’s water network.

New isolation gate valve installed in the 125 mm Royal Holloway water main.
New isolation gate valve installed in the 125 mm Royal Holloway water main.
Client / site
Royal Holloway University
Asset
125 mm incoming water main
Work
Leak repair and valve installation

Project overview

CW Pipewise attended Royal Holloway University following the identification of a leak on the site’s incoming 125 mm water main. The affected section was located and excavated to provide full working access to the main and surrounding services.

Rather than carrying out a localised cut-out repair alone, the works were developed to provide an additional operational benefit. A new below-ground gate valve was installed within the 125 mm main, creating a dedicated isolation point for part of the grounds.

The approach resolved the immediate issue while improving future control of the private water network. The new valve allows the site team to isolate a defined section for maintenance, emergency works or alterations without unnecessarily shutting down a wider area of the campus.

Scope of works and delivery

  1. Locate and expose the affected main

    The team established the position of the incoming 125 mm main and excavated down to the pipework. The excavation provided working access around the main, couplings and adjacent buried services, with groundwater and difficult ground conditions managed throughout.

  2. Prepare the main for alteration

    Once exposed, the existing main was cleaned back and the working area prepared. The section was assessed to position the valve correctly and accommodate the new assembly within the available excavation.

  3. Install the isolation gate valve

    A section of the existing main was cut out and a new full-bore gate valve assembly installed using flanged and mechanical connection components suitable for the existing pipework. The valve was aligned and secured to support the main and allow reliable operation.

  4. Reinstate and provide permanent access

    After the pipework was completed and satisfactorily checked, the excavation was backfilled. A purpose-made valve chamber and ductile access cover were installed, leaving the operating head accessible for future maintenance and emergency isolation.

Engineering outcome

The works repaired the leaking main and gave Royal Holloway University an additional strategic isolation point. The new 125 mm gate valve reduces the extent of future shutdowns and gives maintenance teams greater control when responding to leaks, planned repairs or network modifications.

Discuss your water mains project

Speak to CW Pipewise about repairs, replacement pipework and commercial water infrastructure.

CW Pipewise
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.