Project overview
CW Pipewise attended St Peter’s Hospital in Chertsey following a significant leak on an existing 160 mm MDPE water main. Investigation identified a failed buried coupler, requiring a permanent cut-out repair rather than a temporary sealing measure.
The affected section was isolated and depressurised. The failed coupler and adjoining pipe were removed, and a new 160 mm MDPE section installed using two electrofusion couplers. The repaired main was recommissioned and checked under pressure to confirm that the leak had been resolved.
Scope of works and delivery
Expose and isolate the failed main
The main and defective coupler were fully exposed in a wet excavation containing several adjacent buried services. The affected section was isolated and depressurised before cutting.
Cut out the defective coupler
The failed joint and affected pipe section were removed to leave sound pipe ends. The replacement section was measured to maintain the existing line and minimise stress on the retained main.
Prepare and electrofuse the new section
Both pipe ends were cleaned and mechanically scraped before two new electrofusion couplers were installed. Alignment clamps restrained the assembly throughout the programmed fusion and cooling cycles.
Recommission and test the repair
After both welds had cooled, the clamps were removed and the main returned to service in a controlled manner. The new section and joints were checked under operating pressure, with no further leakage.
Engineering outcome
The failed buried coupler was completely removed and replaced with a new 160 mm MDPE pipe section incorporating two fully fused electrofusion joints. The repair restored the integrity of the supply and provided a permanent solution for continued operation within the hospital estate.
Isolation and recommissioning were planned to minimise disruption to the operational hospital. Wet ground conditions and adjacent buried services were managed throughout the repair.