Thames Water Egham: 180 mm washout main

Installing and fusion welding a new washout main, tested to 10 bar ahead of a planned connection to the existing 225 mm main.
St Peter’s Hospital: 160 mm main repair

A permanent cut-out repair to a failed buried coupler, using a replacement MDPE section and two electrofusion joints.
Royal Holloway: 125 mm water main repair

Repairing a leaking incoming main and adding a permanent isolation point to improve control of the university’s water network.
Royal Holloway: 90 mm tunnel main replacement

Replacing ageing steel pipework in confined service tunnels, with new isolation valves, pressure testing and chlorination.
Thames Water STW – Chertsey

Case Study MDPE Pipeline Installation & Fusion Welding CW Pipewise Ltd recently completed specialist pipeline installation works at the Thames Water STW site in Chertsey on behalf of RMC. The project involved the installation and commissioning of new 180mm MDPE pipework, including full butt fusion welding, testing, and connection into the existing live network. Our […]
Case Study – Incorrect Leak Detection

Kirsty from Viridian Apartments in Reading contacted us regarding a leak coming from a block of 44 apartments that she manages. Thames Water notified her and gave her 2 weeks to investigate and rectify. Kirsty informed CW Pipewise that a leak detection company attended and have been able to narrow down where they believe the […]